Pile Length Determination
Subsequent determination of pile length on existing foundations. Based on travel time measurements at the pile head, evaluated via the material-dependent wave speed.

Static and dynamic load tests, pile instrumentation, remote monitoring, integrity testing and consulting. All methods, all pile sizes, one point of contact.
Subsequent determination of pile length on existing foundations. Based on travel time measurements at the pile head, evaluated via the material-dependent wave speed.
Measurement of settlement and inclination on structures, foundations and test constructions. Displacement resolution 1/100 mm, inclination via chain inclinometer.
Electronically controlled hydraulics keep load or elevation constant over hours and days. Used for long-term loading and for lifting components.
Presses, load cells and units are calibrated and documented in-house. Every test runs with a verified measurement chain.
All measurement and control systems are in-house developments, fully electronic since 1995. Custom setups are built for the respective project.
Control, data acquisition and evaluation run on in-house software. Load steps, holding times, cycles and creep values are freely programmable.
| Feature | Static load test | Pile instrumentation | Remote monitoring | Dynamic load test | Integrity test |
|---|---|---|---|---|---|
| What is recorded | Bearing capacity and settlement | Shaft friction and base resistance | Behaviour over time | Bearing capacity via stress wave | Continuity and cross-section |
| Typical use | Verification of ultimate capacity | Optimisation of pile lengths | Long-term measurement on the structure | Series testing and driving monitoring | Sampling after concreting |
| Timing | after curing | installed before concreting | after the test | after driving | after concreting |
| Duration per pile | depending on test type | with the load test | weeks to months | a few hours | series testing per day |
| Standard | DIN EN ISO 22477-1 | EA-Pfähle, DGGT | project specific, instrumentation to DIN EN ISO 18674 | DIN EN ISO 22477-4 | EA-Pfähle, DGGT |
Tell us the project, the number of piles and the planned test load. You will receive a test concept with a quote within two business days.