IPM production and storage hall with measurement technology and loading equipment in Gotha
About us

About IPM

IPM has tested piles since 1995. The equipment for it is developed in-house, as is the structural design for every test setup. That is the difference between offering and being able to deliver.

Timeline

1995 to today.

Every major project listed here was completed within the agreed period.

  1. 1995

    Founded in Gotha-Boilstädt.

  2. 1999

    In-house development: conversion of the PAK-8 with battery and WLAN for remote desktop use during dynamic load tests.

  3. 2005

    Own measuring devices, own measuring software, 15 MN jack set. First fully electronic static compression load test.

  4. 2006

    Own special free-fall weight with 7, 9 and 12 t.

  5. 2008

    In-house development: eight test beams, 12 m, at least 500 t load per beam.

  6. 2011

    In-house development of the 27 MN jack set.

  7. 2011

    Baltic 2 wind farm (Hemmoor site): static compression and tension tests with instrumentation, August to December.

  8. 2014

    Tengiz oil field, Kazakhstan: 50 static and 100 dynamic load tests, integrity testing, April to October.

    Dead load setup of a static load test at the Tengiz oil field, Kazakhstan
  9. 2018

    In-house development of the 40 MN jack set.

  10. 2020

    BAB A45, Talbrücke Eisern: static load tests up to 30 MN.

  11. 2024

    Munich, U5 West extension: static load tests, displacement and force controlled, inside the test tent, May to December.

    Test tent and crane on the U5 metro line site in München
  12. 2025

    In-house development: eight test beams, 15.1 m, 700 t load per beam.

  13. 2025

    Hamburg, Steinwerder Kai: static load tests with four new test beams, test force 24 MN.

    New 15.1 m test beams at Steinwerder Kai in Hamburg
  14. 2026

    Site expansion: hall extension.

Test setup at Steinwerder Kai in Hamburg in the evening light
Safety

Occupational safety comes first

Every site starts with the hazard assessment, not with the first test beam. Load paths, rescue scenarios, restricted areas. Defined before arrival.

The result shows in the statistics: no workplace accident on site since 1995. This figure is the only proof of quality that cannot be talked up.