Reaction piles with measuring cables for remote monitoring at the U5 metro line in München
Service

Remote monitoring

Long-term measurements on piles and structures with regular remote polling of all readings. You see what the foundation does without being on site.

Long-term measurements

The measurement does not end with the test.

Settlements, forces and displacements are recorded over weeks or months. The sensors stay in the structure instead of being removed after the load test.

What is measured is therefore decided before concreting. The question of later monitoring thus belongs in the test planning.

Regular remote polling

All readings, at fixed intervals.

The readings are polled at fixed intervals and documented. Anomalies are reported, not only in the final report.

Transmission: cable based. Sampling interval: down to the millisecond range. Both are defined per project.

For owners this means the foundation remains measurable after handover. Instead of a single snapshot there is a documented series of values showing whether something changes and in which direction.

The sensors for this come from pile instrumentation. Planning the monitoring early saves retrofitting.

Measured values

What you see.

Live readings from our own measurement software: settlement, settlement rate, load and pressure
Live readings from our own software: settlement, settlement rate, load, pressure
Answers

Frequently asked questions

All questions on process, methods, standards and scheduling are in the FAQ section.

Project inquiry

Request a project

Tell us the project, the number of piles and the planned test load. You will receive a test concept with a quote within two business days.