IPM production and storage hall with measurement technology and loading equipment in Gotha
Service area Alps and Swiss plateau

Pile testing in Switzerland

Static and dynamic load testing, integrity testing and consulting from the planning stage. Test force up to 40,000 kN.

Ground conditions

What the ground in Switzerland demands

Moraines, lake deposits and molasse rock. Lake bottom silts are soft and settlement-sensitive, the molasse below carries load but lies at uneven depth.

Infrastructure, densification in urban areas, industrial buildings on lake shores.

Codes

Eurocode 7, SIA 267.

Recommended method

Static load test. Up to 40,000 kN, own loading platform and beam system.

Project inquiry

Request a project

Tell us the project, the number of piles and the planned test load. You will receive a test concept with a quote within two business days.