IPM production and storage hall with measurement technology and loading equipment in Gotha
Service area Dinaric Alps

Pile testing in Bosnia and Herzegovina

Static and dynamic load testing, integrity testing and consulting from the planning stage. Test force up to 40,000 kN.

Ground conditions

What the ground in Bosnia and Herzegovina demands

Carbonate rock and karst in the south, flysch and valley fills along the rivers. Bearing strata often lie near the surface but are irregularly weathered.

Motorway corridors, bridges, hydropower, industrial buildings.

Codes

Eurocode 7 in national implementation, BAS EN 1997-1.

Recommended method

Integrity test. Low-strain and cross-hole, large quantities.

Project inquiry

Request a project

Tell us the project, the number of piles and the planned test load. You will receive a test concept with a quote within two business days.