IPM production and storage hall with measurement technology and loading equipment in Gotha
Service area Adriatic and Pannonian basin

Pile testing in Croatia

Static and dynamic load testing, integrity testing and consulting from the planning stage. Test force up to 40,000 kN.

Ground conditions

What the ground in Croatia demands

Karst with cavities and fissures on the coast, thick loose sediments inland. In karst a pile can meet a cavity right next to a load-bearing neighbour.

Bridges, port and tourism buildings, transport infrastructure.

Codes

Eurocode 7 with the Croatian national annex, HRN EN 1997-1.

Recommended method

Integrity test. Low-strain and cross-hole, large quantities.

Project inquiry

Request a project

Tell us the project, the number of piles and the planned test load. You will receive a test concept with a quote within two business days.