
Service area Adriatic and Pannonian basin
Pile testing in Croatia
Static and dynamic load testing, integrity testing and consulting from the planning stage. Test force up to 40,000 kN.
Ground conditions
What the ground in Croatia demands
Karst with cavities and fissures on the coast, thick loose sediments inland. In karst a pile can meet a cavity right next to a load-bearing neighbour.
Bridges, port and tourism buildings, transport infrastructure.
Codes
Eurocode 7 with the Croatian national annex, HRN EN 1997-1.
Recommended method
Integrity test. Low-strain and cross-hole, large quantities.
More service areas
Project inquiry
Request a project
Tell us the project, the number of piles and the planned test load. You will receive a test concept with a quote within two business days.
