IPM production and storage hall with measurement technology and loading equipment in Gotha
Static load test Munich

Static load test in Munich

Up to 40,000 kN, own loading platform and beam system. For Munich and Upper Bavaria, with own measurement technology and travel distance about 4 hours from Gotha.

Method

What the test delivers.

The direct proof per DIN EN ISO 22477-1. The load-settlement line shows the real load behaviour under sustained load, up to 40,000 kN test force. Basis for foundation optimisation and for any disputed proof.

Details on the method are on the service page Static load test.

Ground conditions Munich

Munich gravel plain: quaternary gravel over tertiary molasse of alternating clay, silt and sand layers. The gravel carries well, but the boundary to the molasse lies at varying depth, and confined groundwater levels in the tertiary decide the behaviour.

A pile ending in the gravel behaves completely differently from one that reaches into the tertiary. If the layer boundary is assumed wrongly, the real bearing capacity deviates strongly from the calculated one, upward and downward.

Process

Static load test in four steps.

  • Structural design of the reaction system, coordination with structural engineering
  • Setup of loading platform or beam system
  • Load programme in load steps, measure settlement to the millimetre
  • Evaluation, load-settlement line, report suitable for verification
Structural design

The structural engineer gets numbers instead of assumptions. Measured bearing capacity allows a proof per Eurocode 7 without blanket safety margins.

Ground

Munich and Upper Bavaria is geologically inconsistent. The test shows what the pile carries at exactly this spot, not what the ground model would suggest.

Building safety

Differential settlement causes cracks, tilting and re-foundation. Tested piles are the cheapest part of structural stability.

Regional answers

Static load test in Munich, frequently asked questions

All questions on process, methods, standards and scheduling are in the FAQ section.

Static load test in Munich

A soil survey and pile concept are enough for a reliable answer. Travel distance about 4 hours from Gotha.