Pile testing Berlin
Inner-city densification, additional storeys on existing foundations, transport structures, high-rise projects on the water.
about 3 hours from Gotha

Every ground raises its own questions. Choose your location, we name the ground conditions, the suitable method and the lead time.
We work nationwide and in 21 countries. The following pages summarise what the respective ground means for structural design, foundation and building safety.
Inner-city densification, additional storeys on existing foundations, transport structures, high-rise projects on the water.
about 3 hours from Gotha
Port and quay structures, logistics halls on soft layers, housing in the marsh, bridge structures.
about 4 hours from Gotha
High-rise and office construction, deep excavation pits with back anchoring, transport infrastructure, commercial construction in the surrounding area.
about 4 hours from Gotha
High-rises, banking district, airport and logistics buildings, rail and road bridges.
about 2 hours from Gotha
Commercial and logistics construction, transport structures, building on dump areas, existing building protection in old town locations.
about 3.5 hours from Gotha
Slope construction, tunnel and rail structures, industrial construction, underpinning of existing buildings.
about 3.5 hours from Gotha
Logistics and industrial settlements, building on dump areas, transport structures, housing in the floodplain.
about 1.5 hours from Gotha
Flood protection and bridges, semiconductor and industrial construction, heritage foundations, slope construction.
about 3 hours from Gotha
Logistics on the A4, industrial and commercial construction, rail lines, municipal structures.
under 1 hour from Gotha
Trade fair, industrial and logistics construction, transport structures, wind energy in the surrounding area.
about 2.5 hours from Gotha
Industrial and commercial construction, rail hubs and road bridges, inner-city densification.
about 2.5 hours from Gotha
Office construction and densification, conversion sites, logistics, bridges over the Rhine and canals.
about 4 hours from Gotha
Tell us the project, the number of piles and the planned test load. You will receive a test concept with a quote within two business days.