IPM production and storage hall with measurement technology and loading equipment in Gotha
Pile testing Düsseldorf

Pile testing in Düsseldorf

Load testing and integrity testing for Düsseldorf and the Ruhr area. Own measurement technology, test force up to 40,000 kN, travel distance about 4 hours from Gotha.

Ground conditions

What Düsseldorf is founded on.

Lower Rhine terraces of gravel and sand over tertiary, in the Ruhr area carboniferous with historic mining, mine water management and subsidence areas. Filled areas from the industrial era are widespread.

What happens without testing

Over old mining and in fill areas the ground is not what the map shows. Cavities, foundation remnants and varying compaction make any statistical approach unusable.

Untested foundations are not a cost risk, they are a structural stability risk. Differential settlement, cracking and re-foundation cost many times the price of testing.

Typical construction tasks: Office construction and densification, conversion sites, logistics, bridges over the Rhine and canals.

Methods

Three methods, one decision.

In Düsseldorf and the Ruhr area the ground often leads to dynamic load test. We make the final choice based on the ground report and pile concept, not on instinct.

Dynamic load test in Düsseldorf

Bearing capacity of several piles within one day, evaluated per CAPWAP. The method per DIN EN ISO 22477-4 delivers shaft friction and base resistance separately and fits where the construction schedule does not allow a week of setup.

Drop weight up to 12 t, evaluation per CAPWAP

Static load test in Düsseldorf

The direct proof per DIN EN ISO 22477-1. The load-settlement line shows the real load behaviour under sustained load, up to 40,000 kN test force. Basis for foundation optimisation and for any disputed proof.

Up to 40,000 kN, own loading platform and beam system

Integrity test in Düsseldorf

Test of construction quality: length, cross-section, necking, defects. Low-strain from the pile head for the whole site, cross-hole between measuring tubes for the core of large bored piles.

Low-strain and cross-hole, large quantities

Regional answers

Questions on pile testing in Düsseldorf

All questions on process, methods, standards and scheduling are in the FAQ section.

Pile testing in Düsseldorf

A soil survey and pile concept are enough for a reliable answer. Travel distance about 4 hours from Gotha.

Project inquiry

Request a project

Tell us the project, the number of piles and the planned test load. You will receive a test concept with a quote within two business days.