Dynamic load test in Hamburg
Bearing capacity of several piles within one day, evaluated per CAPWAP. The method per DIN EN ISO 22477-4 delivers shaft friction and base resistance separately and fits where the construction schedule does not allow a week of setup.
Drop weight up to 12 t, evaluation per CAPWAP

