IPM production and storage hall with measurement technology and loading equipment in Gotha
Pile testing Hamburg

Pile testing in Hamburg

Load testing and integrity testing for Hamburg and the northern German coastal region. Own measurement technology, test force up to 40,000 kN, travel distance about 4 hours from Gotha.

Ground conditions

What Hamburg is founded on.

Elbe marsh with clay, peat and silt over load-bearing sands. The soft layers reach more than 20 metres deep in places, plus tide-affected groundwater. Bearing capacity only develops at depth, shaft friction above it is low and time dependent.

What happens without testing

Whoever applies shaft friction in the clay calculates a bearing capacity that does not remain after consolidation. Negative shaft friction from settlement of the soft layers loads the pile further instead of carrying it.

Untested foundations are not a cost risk, they are a structural stability risk. Differential settlement, cracking and re-foundation cost many times the price of testing.

Typical construction tasks: Port and quay structures, logistics halls on soft layers, housing in the marsh, bridge structures.

Methods

Three methods, one decision.

In Hamburg and the northern German coastal region the ground often leads to static load test. We make the final choice based on the ground report and pile concept, not on instinct.

Dynamic load test in Hamburg

Bearing capacity of several piles within one day, evaluated per CAPWAP. The method per DIN EN ISO 22477-4 delivers shaft friction and base resistance separately and fits where the construction schedule does not allow a week of setup.

Drop weight up to 12 t, evaluation per CAPWAP

Static load test in Hamburg

The direct proof per DIN EN ISO 22477-1. The load-settlement line shows the real load behaviour under sustained load, up to 40,000 kN test force. Basis for foundation optimisation and for any disputed proof.

Up to 40,000 kN, own loading platform and beam system

Integrity test in Hamburg

Test of construction quality: length, cross-section, necking, defects. Low-strain from the pile head for the whole site, cross-hole between measuring tubes for the core of large bored piles.

Low-strain and cross-hole, large quantities

Regional answers

Questions on pile testing in Hamburg

All questions on process, methods, standards and scheduling are in the FAQ section.

Pile testing in Hamburg

A soil survey and pile concept are enough for a reliable answer. Travel distance about 4 hours from Gotha.

Project inquiry

Request a project

Tell us the project, the number of piles and the planned test load. You will receive a test concept with a quote within two business days.