Dynamic load test Stuttgart

Dynamic load test in Stuttgart

Drop weight up to 12 t, evaluation per CAPWAP. For Stuttgart and the Neckar region, with own measurement technology and travel distance about 3.5 hours from Gotha.

Method

What the test delivers.

Bearing capacity of several piles within one day, evaluated per CAPWAP. The method per DIN EN ISO 22477-4 delivers shaft friction and base resistance separately and fits where the construction schedule does not allow a week of setup.

Details on the method are on the service page Dynamic load test.

Ground conditions Stuttgart

Gipskeuper, Schilfsandstein and Lettenkeuper on slopes, anhydrite and gypsum layers prone to karstification, plus mineral water occurrences with strict requirements for any intervention in the ground.

Swelling anhydrite lifts structures, leaching creates cavities. Both are localised, not widespread, a borehole next to it does not show it. Without measurement on the built pile, it remains open what it actually stands on.

Process

Dynamic load test in four steps.

  • Expose pile heads, apply transducers
  • Series of blows with drop weight, measure force and velocity
  • CAPWAP model analysis, separation of shaft and base
  • Report with bearing capacity and assessment per EA-Pfähle
Structural design

The structural engineer gets numbers instead of assumptions. Measured bearing capacity allows a proof per Eurocode 7 without blanket safety margins.

Ground

Stuttgart and the Neckar region is geologically inconsistent. The test shows what the pile carries at exactly this spot, not what the ground model would suggest.

Building safety

Differential settlement causes cracks, tilting and re-foundation. Tested piles are the cheapest part of structural stability.

Regional answers

Dynamic load test in Stuttgart, frequently asked questions

All questions on process, methods, standards and scheduling are in the FAQ section.

Dynamic load test in Stuttgart

A soil survey and pile concept are enough for a reliable answer. Travel distance about 3.5 hours from Gotha.