IPM production and storage hall with measurement technology and loading equipment in Gotha
Integrity test Frankfurt am Main

Integrity test in Frankfurt am Main

Low-strain and cross-hole, large quantities. For Rhine-Main region, with own measurement technology and travel distance about 2 hours from Gotha.

Method

What the test delivers.

Test of construction quality: length, cross-section, necking, defects. Low-strain from the pile head for the whole site, cross-hole between measuring tubes for the core of large bored piles.

Details on the method are on the service page Integrity test.

Ground conditions Frankfurt am Main

Frankfurt clay, a tertiary, overconsolidated clay with embedded limestone bands, underlain by Frankfurt limestone. The clay creeps under sustained load, its stiffness depends on stress level and time. Combined pile-raft foundations are standard here, especially in high-rise construction.

Creep deformation does not show up in a short-term test or in a calculation with experience values. Whoever sets the load split between raft and pile without measurement has an assumption, not a proof.

Process

Integrity test in four steps.

  • Clean pile heads, define measuring points
  • Low-strain per pile, cross-hole between measuring tubes if needed
  • Signal evaluation, flag conspicuous piles
  • Report per pile, documented and legally sound
Structural design

The structural engineer gets numbers instead of assumptions. Measured bearing capacity allows a proof per Eurocode 7 without blanket safety margins.

Ground

Rhine-Main region is geologically inconsistent. The test shows what the pile carries at exactly this spot, not what the ground model would suggest.

Building safety

Differential settlement causes cracks, tilting and re-foundation. Tested piles are the cheapest part of structural stability.

Regional answers

Integrity test in Frankfurt am Main, frequently asked questions

All questions on process, methods, standards and scheduling are in the FAQ section.

Integrity test in Frankfurt am Main

A soil survey and pile concept are enough for a reliable answer. Travel distance about 2 hours from Gotha.

Project inquiry

Request a project

Tell us the project, the number of piles and the planned test load. You will receive a test concept with a quote within two business days.